This is a quick update on the physical plant of St. Paul’s.
Mayfair entrance steps. The work on the steps and sidewalk around the Mayfair Drive entrance to the narthex is almost complete. I am told that iron railings will be added to the steps, presumably to match the railings in front of the building. The sidewalk is a good match for the existing sidewalk. Alas, the steps do not look anything like the front steps.
Parking lot striping. Parking places have again become visible with the repainting of stripes in the parking lot. My suggestion for minor improvements in the definition of spaces was ignored.
Parking lot lights. The parking lot lights, which have been out since at least March 3—see “Dark Day for Kenyon Concert”—are still not working. I don’t know what the problem is, but I have made the junior warden aware of the problem. I am concerned that the lack of illumination in the parking lot at night might lead to accidents.
“The Intel On This Wasn’t 100 Percent”
8 years ago
No comments:
Post a Comment